建于1965年的西蒙菲莎大學(xué)本那比校區(qū)是加拿大建筑中重要的作品之一。其廣場則擁有雙重功能,既是一個公共空間,又可以作為下方教育空間的頂棚。歷經(jīng)五十年的使用,頂棚上的薄膜與飾面亟需更新。
Built in 1965, the Erickson / Massey Simon Fraser University Campus is among the most significant pieces of Canadian architecture. The Plaza serves a double function as a public space and as a roof sheltering education spaces beneath. After fifty years of use, the roofing membrane and finishes gravely needed renewal.
本那比山形成的特殊微氣候產(chǎn)生了快速的凍融循環(huán),加上排水不充分的因素,導(dǎo)致原有的陶瓷飾面損壞脫落。設(shè)計(jì)團(tuán)隊(duì)采用透水鋪裝系統(tǒng),并用加拿大花崗巖來替換現(xiàn)有的粘土磚來解決這一問題。
Burnaby Mountain’s unique microclimate produces rapid, freeze-thaw cycles. This and inadequate drainage caused the original ceramic finishes to fail. The design team addressed this challenge with a permeable paving system and replacement of existing clay tiles with Canadian granite.
本那比校區(qū)的創(chuàng)立是一個真正綜合的設(shè)計(jì)過程。廣場和主廳由Arthur Erickson與Geoffrey Massey設(shè)計(jì),也包括其他設(shè)計(jì)團(tuán)體的一些重要的設(shè)計(jì)作品,如Zoltan Kiss設(shè)計(jì)的學(xué)術(shù)合院、Rhone and Iredale設(shè)計(jì)的科學(xué)綜合體、Duncan McNab and Associates設(shè)計(jì)的劇院和體育館,以及由Robert Harrison設(shè)計(jì)的圖書館。這些建筑直接與主干道相連,形成一處集聚的整體。
The original creation of SFU’s iconic Burnaby campus plan was a truly integrated design process: The Plaza and Main Mall were designed by Arthur Erickson and Geoffrey Massey so that the significant architectural pieces designed by other firms – the Academic Quadrangle by Zoltan Kiss, the Science Complex by Rhone and Iredale, the Theatre and Gymnasium by Duncan McNab and Associates, the Library by Robert Harrison – would plug directly into the main pedestrian arterial and form a cohesive whole.
在近55年后的今天,翻修工作令諸多公司得以在校園的不同部分并肩作戰(zhàn),但彼此間卻共享著同一個努力愿景,延續(xù)當(dāng)年的精神。
Now, nearly 55 years later, the renewal involves as many firms working side-by-side on different portions of the campus aiming for alignment where their efforts meet and a continuation of the spirit and vision of the time.
為一處歷史悠久的公共空間注入新的生命,設(shè)計(jì)展開了更新而非替換的開創(chuàng)性嘗試,也為后世保留了60年前的重要文化遺產(chǎn),對話、跨學(xué)科工作與景觀的整合均成為設(shè)計(jì)的靈感來源。
Breathing new life into an historic public space sets a precedent for renewal over replacement and also preserves important cultural heritage of the 1960s with its inspired goals of dialogue, interdisciplinary work, and landscape integration for future generations.
項(xiàng)目為全面改善公共空間提供了一個難得的機(jī)會,飾面、照明、樓梯、欄桿、家具和植物均煥然一新。此外,翻修工作尊重了會議廳上具有的儀式感,也為日常的使用提供了更多的契機(jī),為大眾提供了一處可以集聚、逗留、閑談的場地。
This project provided a rare opportunity to comprehensively improve the public realm, including updates to surfaces, lighting, stairway finishes, railings, site furniture, and plantings. In addition, the renewal respects the formal ceremonial nature of Convocation Mall while providing increased opportunities for day-to-day users to gather, linger, and connect informally.
最小化的干預(yù)也為設(shè)計(jì)過程帶來了挑戰(zhàn):現(xiàn)有的門窗和樓梯門檻的位置被限定在已有結(jié)構(gòu)之上3.5英寸的范圍內(nèi)。為了允許卡車通行,廣場需要澆筑加固,一個傳統(tǒng)的、僅由基座支撐的平面已經(jīng)不再適用。雙層排水系統(tǒng)允許雨水即可通過地表排水口排出,也可通過透水砂漿系統(tǒng)(環(huán)氧樹脂與鳥眼石礫組成的結(jié)構(gòu))滲透,使水流直接穿過該層到達(dá)下方的防水膜。
Minimal intervention complicated the project: Existing door, window, and stair thresholds allowed no more than 3.5 inches of build-up on top of the existing structure. To support service trucks, the Plaza required a fully-grouted—rather than a conventional, pedestal-supported—finish. The two-level drainage system allows rain-water egress by surface drains and via a permeable mortar system (epoxy and birds-eye gravel matrix), allowing water to run right through to the membrane beneath.
建筑實(shí)踐正逐步厘清老化歷史混凝土的復(fù)雜問題。此次的廣場翻修項(xiàng)目推進(jìn)了以混凝土保護(hù)為重點(diǎn)的研究歷程,對全尺寸原位安裝屋頂組件、雙層排水及新型注漿材料與系統(tǒng)等技術(shù)進(jìn)行了探索。
Architectural practice is at the beginning of untangling the complexities of ageing historic concrete. The SFU Plaza project has helped advance research focused on concrete conservation (for example, the performance testing of full-scale, in-situ roof-assembly mock-ups, bi-level drainage, and new grouting materials and systems).
此外,廣場更新開發(fā)的計(jì)劃策略及研究成果支持了其他具有文化價值的“二戰(zhàn)”后建筑作品的保護(hù)工作,對其他現(xiàn)代主義風(fēng)格校園也具有參考意義。可以說,此次更新將本那比校區(qū)這一廣場的壽命又延長了一倍。
In addition, the design strategies developed for the SFU Plaza renewal and research results support the efforts of others preserving post-war architectural works of cultural significance, including other Modernist campuses. The renewal doubled the life of the masterwork SFU Burnaby campus.
設(shè)計(jì)圖紙 ▽
完整項(xiàng)目信息
Marketing name: Plaza Renewal, Burnaby Campus, Simon Fraser University
Address: 8888 University Drive Burnaby BC V5A 1S6
Architecture: PUBLIC: Architecture + Communication
Design Principals: Susan Mavor and John Wall
PUBLIC Team: Jay Alkana, Alberto Buldon, Martina Caniglia, Chris Forrest, Courtney Healey, Laura Killam, Andrea Kopecka, Genevieve Mateyko, Marta Nicolau, Henry Posner
Project Manager: George Venini
Type of space: Education
Month and year of construction completion: Phase 2: February 11, 2021 (Phase 3 ongoing)
Square footage: 265,685 SF
Brands/products used in construction:
Romex Trass Bed and Rompox Drain system
Polycor Granite Tiles
Construction cost: $50,000,000
Photo/rendering credit:
Upper Left Photography
Luc di Pietro
Project scope (bold all that apply): Renewal
版權(quán)聲明:本文由PUBLIC: Architecture + Communication授權(quán)發(fā)布。歡迎轉(zhuǎn)發(fā),禁止以有方編輯版本轉(zhuǎn)載。
投稿郵箱:media@archiposition.com
本文版權(quán)歸腿腿教學(xué)網(wǎng)及原創(chuàng)作者所有,未經(jīng)授權(quán),謝絕轉(zhuǎn)載。
上一篇:[db:標(biāo)題]
下一篇:[db:標(biāo)題]
推薦專題